> Home / CCS / CO2 infrastructure



CO2 infrastructure

GassTEK performs:

  • Studies for transport solutions for CO2.
  • Early phase cost estimations of CO2 transport solutions.

After the capture process the CO2 has typically a pressure of about 1.5 bar and a temperature of 40°C. Before transport to permanent storage, pre-treatment of the gas is needed to meet the transport requirements. The extent of pre-treatment and the methods used will depend on the transportation method.

CO2 can either be transported by ship/barge or pipelines. The transport solutions have different advantages depending on the transport volume, transport distance, flexibility demands and time of investment decision.

A selection of projects and publications.

Share |

GassTEK

It is GassTEK who works with CO2 infrastructure.


Developed by Grenland Web AS - Powered by eZ Publish - Logg inn